How Much Does It Cost to Open a The UPS Store?

How Much Does It Cost to Open a The UPS Store?
How Much Does It Cost to Open a The UPS Store?

How Much Does It Cost to Open a The UPS Store?: The UPS Store was founded in the 1980s as Mail Boxes Etc. The UPS Store branding was introduced in 2003, two years after UPS acquired Mail Boxes Etc., Inc. In 2012, franchisor Mail Boxes Etc., Inc., which had been operating under UPS since the acquisition, changed its name to The UPS Store, Inc. All former Mail Boxes Etc. stores were also rebranded at the same time. How Much Does It Cost to Open a The UPS Store?

Read More…………….. Burger King Franchise Cost 2024-25 | Procedure, Documents Required

The estimated financial range to set up and operate a traditional UPS Store location in the United States for the first month is $154,745 to $508,472. The data in the information below is from The UPS Store Franchise Disclosure Document (FDD), dated 2022. Estimates are provided by The UPS Store and are based on its years of experience franchising its system. How Much Does It Cost to Open a The UPS Store?

How Much Does It Cost to Open a The UPS Store?

Name of FeeLowHigh
Initial Franchise Fee$9,950$29,950
Initial Marketing Plan Fee$4,000$7,500
Design Fee$1,075$2,100
Site Survey$0$1,500
Center Development Fee$5,000$5,000
Initial Training Fees$4,650$6,800
Travel and Living Expenses While Training (per person)$3,000$4,000
Site Rent and Security Deposit$1,000$18,000
Leasehold Improvements; Construction Costs; Signage; Furniture and Decor Items$56,178$265,838
Computer Hardware/ Installation/ Freight$5,692$11,163
Optional Locker Fixture(s)$0$12,616
Optional Locker Annual Subscription Agreement$0$1,428
Digital Media$0$6,452
Keyless Entry$0$845
Annual Technology Development and Support Fee$2,196$2,304
Software$3,489$5,489
Printer Lease$1,248$3,096
Other Equipment$9,887$37,236
Start-Up Supplies$6,180$9,155
Utility Deposits$200$3,000
Insurance$1,000$5,000
Additional Funds – 3 months$40,000$70,000
ESTIMATED TOTAL*$154,745$508,472

Other Fees

Type of FeeAmount
Royalty5% of STR (STR includes all gross sales plus gross commissions from the center, less allowable exclusions).
The UPS Store Marketing Fee1% of STR.
National Advertising Fee (NAF)2.5% of STR.
Advertising Co-op DuesVaries from Co-op to Co-op. Range is $100 – $500.
Annual Technology Development and Support Fee$2,304 (new center franchise and transfers); $2,196 (rural center);
$2,196 per center if franchisees are purchasing their 2nd or greater franchise.
Transfer FeeThe current transfer fee is $5,000 (the franchisor may periodically increase this fee).
Processing FeeThe current processing fee is $4,000 if no finder’s fee is paid to the franchisor; $1,000 if a finder’s fee is paid (the franchisor may periodically increase this fee).
Renewal Fee25% of the then-current initial franchise fee.
Sales Fee25% of the then-current initial franchise fee.
InsuranceAmount of unpaid premiums.
AuditCost of audit ($475 minimum) plus 18% interest or the highest rate allowed by law on underpayment. In addition, the franchisee must pay a late fee of $25 per week.
Audit Non-Prepared Fee$500 per type of document (as specified in operations manual) not supplied upon auditor’s request but in no event greater than $2,500 per occurrence, and cost of audit (including reasonable expenses incurred by auditor) if rescheduled.
Non-Transfer Ownership Change Fee$500
Incorporation Fee$500
Family Transfer Fee$1,750
Entity Name Change Fee$500
IndemnificationWill vary under circumstances.
Interest on Financing Offered by FranchisorFinancing of initial equipment: prime rate plus 4%. Financing for the purchase of a second center: prime rate plus 2%. Financing for the TUPSS 2000 remodel of the center: prime rate plus 1%.
Late Payment Fee$35 per month or 10%, whichever is greater.
Equipment or Equipment Lease and Computer Hardware/Software MaintenanceVaries.
iShip Processing Fee$0.22 per transaction.
Upgrade Evaluation Fee$500
Finder’s FeeThe greater of $11,980 or 10% of the center’s sales price.
Finance ChargesHighest annual rate allowed under applicable law.
Design FeeLaser Lite – $2,100 or $800 (plus $350 in the event of a change)
Blue Horizon – $800 (plus $350 in the event of a change)
TUPSS 2000 – $660 (plus $250 in the event of a change)
Site Survey Fee$1,500
Non-Compliance FeeCurrently $250, but the franchisor may charge up to $1,000.
Tax ReimbursementOut-of-pocket cost reimbursement.
Customer Concern ReimbursementOut-of-pocket cost reimbursement.

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top